Guide:Home >> News >> How much space does the large shredder need to?
Product Center
Fast Link

How much space does the large shredder need to?

Recently, many customers have consulted the recycling line of used cars. Before purchasing equipment, you need to plan the site:

First, users need to consider how big the production mode of the large shredder production line they are investing in,for example: 1300 type large car shell shredded recycling line, feeding conveyor belt can choose length of 12 meters, 18 meters, 22 meters, 28 meters, etc., the discharge length can be selected to be 6 meters, 10 meters, 14 Meter, 18 meters, etc. Coupled with sorting equipment, dust removal equipment, the entire production line needs to be the size of the site area that you need to prepare.

Second, it is necessary to consider the floor space of the auxiliary equipment of the waste cars shell recycling line, such as: the area of the dust collector, the area required for the transportation of the vehicle, the floor space required for the stacking of the finished materials, and the stacking area of the raw materials.

Finally, the user can plan the area of the car shell production line according to the data combined with his actual site. The size of the site area is as large as possible than the statistical data, in case the site size is not sufficient, otherwise the production and processing will be influential.


Get A Free No Obiligation Quote Now!

*
*
*
*

Tel:0086-0371-53762053

Tel:0086-13674998188

Whatsapp:0086 13674998188

Skype:yuxi.zhengzhou

Wechat:8613674998188